Products of other enterprises
Description
These are most suitable for temporary sites e.g. Construction sites. Ramps are steel fabricated, therefore do not need traditional cement foundation. Conventional weighbridges need one to two months for commissioning after placing the order, whereas Mobile weighbridges takes only a couple of days for installation at site. The load cells are installed between the frame and the top frame.
Features:
-
Steel fabricated design - completely supplied with platform, bottom frame and ramps.
-
Needs no R.C.C. foundation.
-
Transportation and re-installation is cost effective.
-
Most suited for temporary sites.
-
Saves time and construction costs significantly.
-
Fabricated with high grade raw material to ensure maximum efficiency.
-
Easy Installation.
-
Smooth operation.
Contact the seller
Mobile Weighbridge